New Whiteland and Whiteland are small towns in Johnson County, sitting directly south of Greenwood along the I-65 corridor. If you’re planning to build a deck in either town, you’ll need a building permit before work begins — but the process is handled by two separate town governments, each with its own applications, contacts, and review timelines. This guide walks you through both.

Which Town Are You In?

New Whiteland and Whiteland are neighboring but separate municipalities with their own building departments. Your property’s jurisdiction determines which office handles your permit.

DetailNew WhitelandWhiteland
Permit OfficeTown Hall — Planning & ZoningTown Hall — Community Development
Address540 Tracy Rd, Ste A, New Whiteland, IN 46184549 E. Main St, Whiteland, IN 46184
Phone(317) 535-9487(317) 535-5531
Emailpermits@newwhiteland.in.govcommunitydevelopment@whitelandin.us
HoursMon–Fri, 7 AM–12 PM & 1–4 PMMon–Fri, 8 AM–12 PM & 1–5 PM
Review TimeMinimum 2 weeks5–10 business days

New Whiteland

New Whiteland: How to Get a Deck Permit

The Town of New Whiteland handles building permits through its Planning & Zoning Department:

  1. Get the application. Request from Town Hall at 540 Tracy Road, Suite A, or email permits@newwhiteland.in.gov.
  2. Prepare your documents. Completed application, site plan with property lines and setback distances, and construction plans.
  3. Submit. Email to permits@newwhiteland.in.gov or hand-deliver during office hours.
  4. Pay the initial fee. A portion is due at filing. The balance is due when the permit is approved.
  5. Wait for review. Allow a minimum of two weeks.
  6. Begin work. Post the permit visibly on site and schedule inspections as required.

Whiteland: How to Get a Deck Permit

Whiteland requires a permit for any improvement exceeding $500 in value:

  1. Download the application. Available as a fillable PDF on townofwhiteland.com.
  2. Prepare documents. Completed application (signed), site layout with dimensions and distances to property lines.
  3. Get HOA approval. If your subdivision has an HOA, an approval letter is required before the town will issue the permit.
  4. Submit. Deliver to 549 E. Main St or email to communitydevelopment@whitelandin.us. No fees due at submission.
  5. Wait for review. Allow 5–10 business days. A site visit may be required.
  6. Pay and pick up. Fee amount provided upon approval. Payment at Town Hall (cash, check, or credit card with processing fee).
  7. Post and inspect. Permit must be posted visibly throughout construction.

Whiteland permits expire if work doesn’t start within 60 days or isn’t completed within one year.

What Inspections Are Required?

InspectionDetails
Footing InspectionAfter holes are dug but before concrete is poured. Footings must reach 42 inches in central Indiana.
Framing / Rough-InAfter structure is framed but before decking is installed. Checks post connections, beams, joists, ledger, hardware.
Final InspectionAfter all work is complete — decking, railings, stairs, electrical. Full code compliance review.

Setback Rules and Zoning Basics

  • Front yard setbacks are typically the largest and vary by district. Decks are rarely built in front yards.
  • Side yard setbacks usually range from 5 to 10 feet depending on zoning district and lot size.
  • Rear yard setbacks are where most decks go. Expect 20–30 feet minimum for the principal structure.
  • Attached decks must meet the same setbacks as the house itself in Whiteland.

Always confirm your specific setback requirements before finalizing your deck design. Contact New Whiteland at (317) 535-9487 or Whiteland at (317) 535-5531.

If you’re familiar with how neighboring Greenwood handles zoning, the overview of HOA and zoning rules for outdoor projects in Greenwood offers a useful comparison.

HOA Approval: A Key Step in Whiteland

Whiteland explicitly requires an HOA approval letter before the town will issue a building permit for properties in managed subdivisions. Reach out to your HOA early — architectural review can take several weeks.

New Whiteland doesn’t have the same formal requirement in the permit process, but you’re still responsible for complying with your subdivision’s covenants.

Indiana Building Code Basics for Decks

  • Footing depth — 42 inches in central Indiana (Johnson County).
  • Guardrails — Required on any surface more than 30 inches above grade. Minimum 36 inches high.
  • Baluster spacing — No more than 4 inches between balusters.
  • Stair requirements — Uniform treads and risers. Handrails on stairs with 4+ risers.
  • Ledger board — Lag screws or through-bolts required, with flashing.

Common Mistakes to Avoid

  • Submitting to the wrong town. New Whiteland and Whiteland are separate municipalities.
  • Skipping the HOA step in Whiteland. The town won’t issue your permit without the approval letter.
  • Incomplete applications. Missing site plans or unsigned forms slow down both towns.
  • Starting before the permit is issued. Both towns enforce permit requirements.
  • Letting the permit expire. In Whiteland, permits expire after 60 days without activity or 1 year without completion.

Do Patios Need a Permit?

A ground-level patio generally does not require a building permit. However, if the project affects drainage or lot coverage, check with the planning department. In Whiteland, any improvement over $500 technically requires a permit, so a quick call to (317) 535-5531 is worthwhile.

For more on patio design choices, the guide to paver patio options for nearby Greenwood homes covers popular layouts and materials.

Let Platinum Deck and Patio Handle the Permit Process

Navigating permits in small-town Johnson County doesn’t have to be complicated. Platinum Deck and Patio works with local building departments across the Greenwood, Whiteland, and New Whiteland area regularly — and handles the permit process, plans, and inspections so you can focus on enjoying your new outdoor space. Call (463) 466-5870 to get started.